Ivey's Construction, Inc.


DESIGN BUILD
Previous | Design Build | Next

Cruise Terminal Six (CT-6)

 

Owner: Canaveral Port Authority
Location: Cape Canaveral, FL

 

Project Description:

The design-build team of Skanska/Ivey's Construction/BEA Architects/BRPH/Stottler Stagg designed and constructed the $26 million, two stories, 120,000 sq. ft. cruise terminal for the Canaveral Port Authority.

The project had a short timeframe that required a fast track schedule and with a congested location adjacent to other busy cruise terminals, and a concurrent waterfront wharf construction project.

The state of the art facility presents many important features that provide a great passenger experience while balancing the security requirements of the CBP (Customs and Border Patrol) and Carnival Cruise Lines operations.

 

Home | Company Profile | General Contracting | Design Build | Construction Management | Structural Steel | Clients | News | Safety | Contact Us
 

Hosting & Production by
BusinessMasters.Net